Fence Ledger
How many posts your fence needs — counted properly, including the ones corners and gates force on you.
These are typical values, not requirements. Post depth in particular is governed by your local frost line and building code — check before you dig.
National planning ranges compiled from published US construction cost guides, last checked September 2026 (confidence: medium-low). Prices vary sharply by region, season and contractor. These are estimates for planning, not quotes.
Sources: homeguide.com, calcsummit.com, angi.com, ergeon.com, homewyse.com
| Material | Size | Quantity |
|---|---|---|
| Posts | 4x4 | 21 |
| Rails incl. waste | 2x4 | 63 |
| Pickets incl. waste | 1x6 | 336 |
| Concrete mix | 35bags | |
| Gravel | 8bags | |
| Exterior screws | ≈2,200 | |
| Walk gate kit | 1 |
Divide the length by the spacing, round up, add one. That is correct for a single unbroken straight run and undercounts every other shape, because it treats the fence as one continuous thing when it is not.
Some posts are not optional. Every corner needs one, because you cannot span a change of direction with a rail. Every gate needs one on each side. Every open end needs one. Those forced posts cut the fence into independent runs, and each run has to be divided and rounded on its own.
On a 50 by 30 foot yard, rounding each side separately gives 22 posts. Rounding the 160-foot perimeter as a whole gives 20. Two posts is not much money, but it is a second trip, and you find out about it with the holes already dug.
On an L-shaped run of 75 and 42 feet, the gap is one post and one section of rail. The pattern holds for every shape with a corner in it: the more corners, the more the shortcut costs you.
Eight-foot centres are the residential default for one practical reason: 2×4 rail stock is commonly sold in eight-foot lengths, so one rail spans exactly one section from post centre to post centre with nothing to cut and nothing to join.
Closer spacing costs more posts and more concrete but sags less, which matters on tall fences and exposed sites. Wider spacing means cutting and joining rails mid-span, which is weaker and wastes material. Both are available here; eight is where most projects land.