Fence Ledger
Three different pieces of timber go into a privacy fence and they are counted in three different ways, which is why a single number for lumber is never much use.
Plus 14 posts. Picket and rail counts include a 10% waste allowance; posts do not, because you cannot buy a tenth of one.
Posts, rails and pickets do not share a waste allowance. Pickets and rails get cut and some get rejected for warp, so a percentage on top is sensible. Posts do not — you buy them whole, you use them whole, and adding 10% to a post count just leaves you with a spare you did not plan for. Treating waste as one number across the whole order is how people end up over on one item and short on another.
Every assumption above is editable. Change the length, the spacing, the hole size — the numbers and the working update as you go.
These are typical values, not requirements. Post depth in particular is governed by your local frost line and building code — check before you dig.
National planning ranges compiled from published US construction cost guides, last checked September 2026 (confidence: medium-low). Prices vary sharply by region, season and contractor. These are estimates for planning, not quotes.
Sources: homeguide.com, calcsummit.com, angi.com, ergeon.com, homewyse.com
| Material | Size | Quantity |
|---|---|---|
| Posts | 4x4 | 14 |
| Rails incl. waste | 2x4 | 40 |
| Pickets incl. waste | 1x6 | 222 |
| Concrete mix | 24bags | |
| Gravel | 6bags | |
| Exterior screws | ≈1,500 | |
| Walk gate kit | 1 |