How many 2x4s do I need for a 100 ft fence?

Rail stock is the item people most often underbuy, because it is easy to work out from the fence length and easy to get wrong by one whole multiple.

Rails needed
43

3 per section across 13 sections, plus a 10% waste allowance.

What the usual answer misses

The trap is multiplying the fence length by the rails per section instead of multiplying the section count by it. Those are different numbers whenever the run does not divide evenly by the post spacing, and they diverge further the more corners and gates the fence has, because each forced post adds a section boundary. Count sections first, then rails.

Work out your own

Every assumption above is editable. Change the length, the spacing, the hole size — the numbers and the working update as you go.

Units
Shape
Advanced options

These are typical values, not requirements. Post depth in particular is governed by your local frost line and building code — check before you dig.

Posts
14
Sections
12
Pickets
222
Concrete
24 bags

Estimated cost

Materials only (DIY)
$1,000 – $2,600
Professionally installed
$2,700 – $6,100

National planning ranges compiled from published US construction cost guides, last checked September 2026 (confidence: medium-low). Prices vary sharply by region, season and contractor. These are estimates for planning, not quotes.

Sources: homeguide.com, calcsummit.com, angi.com, ergeon.com, homewyse.com

Shopping list

Bill of materials for this fence
MaterialSizeQuantity
Posts4x414
Rails incl. waste2x440
Pickets incl. waste1x6222
Concrete mix24bags
Gravel6bags
Exterior screws1,500
Walk gate kit1

Why these numbers

How we got the section count
  1. Run 1: 96 ft ÷ 8 ft = 12, rounded up to 12 sections
How we got the post count
  1. 3 posts are fixed by the shape itself
  2. 2 at the open ends
  3. 1 carrying a gate
  4. 11 line posts spaced between them
  5. 14 posts in total
How we got the picket count
  1. Each picket covers 5.5 in plus a 0.25 in gap, so they repeat every 5.75 in
  2. 96 ft of fence needs 201 pickets
  3. Plus 10% for offcuts, rounded up to 222
How we got the concrete
  1. Each 10 in hole is 30 in deep, less 4 in of gravel base, leaving 26 in of concrete
  2. The 4x4 post itself takes up part of that, so each hole needs the remainder
  3. Across 14 posts
  4. Divided by the 0.6 cu ft a bag yields: 23.27, so buy 24 bags

Common questions

Are 2x4s the only option for rails?
They are the common one for residential wood fence. Heavier stock appears on taller fences and on exposed sites, and some builders use a wider board laid flat as a top rail for stiffness. What matters is that the rail can span the post spacing without sagging.
Do rails need to be pressure treated?
They are less exposed than the posts, which sit in the ground, but they still get wet and stay wet where the pickets touch them. Most people use treated stock throughout for a fence expected to last, and it is a small share of the total cost.
How are rails fixed to the posts?
Either butted between the posts on brackets or cleats, or run across the face of the posts and fixed through. Face-fixing is faster and stronger in tension; butting looks tidier and keeps the fence line flat. Both need enough fasteners at each joint, which the calculator estimates.