Fence Ledger
Rails are the horizontal 2x4s the pickets are nailed to, and how many each section needs is decided by the height of the fence rather than by taste.
Derived from the fence height, not chosen. A taller fence needs another rail to stop the boards bowing in the middle.
The rail count is not a style choice, it is what stops the boards bowing. A picket fixed only at top and bottom over six feet has an unsupported middle, and it will cup outward within a couple of seasons of sun and rain. That is why the count steps up with height rather than staying at two — and it is the first thing quietly dropped from a cheap quote, because it is invisible from the street on the day the fence is finished.
Every assumption above is editable. Change the length, the spacing, the hole size — the numbers and the working update as you go.
These are typical values, not requirements. Post depth in particular is governed by your local frost line and building code — check before you dig.
National planning ranges compiled from published US construction cost guides, last checked September 2026 (confidence: medium-low). Prices vary sharply by region, season and contractor. These are estimates for planning, not quotes.
Sources: homeguide.com, calcsummit.com, angi.com, ergeon.com, homewyse.com
| Material | Size | Quantity |
|---|---|---|
| Posts | 4x4 | 3 |
| Rails incl. waste | 2x4 | 4 |
| Pickets incl. waste | 1x6 | 10 |
| Concrete mix | 5bags | |
| Gravel | 2bags | |
| Exterior screws | ≈80 | |
| Walk gate kit | 1 |