Fence Ledger
One section is the unit people build in, so it is the number worth knowing before you order anything: multiply it out and you have the whole fence.
Boards to fill one bay. Add a waste allowance when you order for the whole fence, not per section.
The gap between boards is doing more work in this calculation than most people expect. A quarter-inch gap on a 5.5 inch board is not a rounding detail — across a section it removes a board roughly every twenty, and across a long fence that is a bundle. The gap exists because timber swells when it is wet, and boards butted tight in dry weather will cup or push each other loose later.
Every assumption above is editable. Change the length, the spacing, the hole size — the numbers and the working update as you go.
These are typical values, not requirements. Post depth in particular is governed by your local frost line and building code — check before you dig.
National planning ranges compiled from published US construction cost guides, last checked September 2026 (confidence: medium-low). Prices vary sharply by region, season and contractor. These are estimates for planning, not quotes.
Sources: homeguide.com, calcsummit.com, angi.com, ergeon.com, homewyse.com
| Material | Size | Quantity |
|---|---|---|
| Posts | 4x4 | 3 |
| Rails incl. waste | 2x4 | 4 |
| Pickets incl. waste | 1x6 | 10 |
| Concrete mix | 5bags | |
| Gravel | 2bags | |
| Exterior screws | ≈80 | |
| Walk gate kit | 1 |